High Tech

CISCO

Two-Phase, Two-Floor Project - Demolish existing offices and labs

  • Replace 75% of existing duct system and raise entire sprinkler system to accommodate higher ceilings
  • Construct Cisco standard offices, open furniture areas, 4000 SF IOS lab 4000 SF, two bench labs and a 3000 SF data center with UPS and emergency generator back-up
  • The first 80,000 SF was turned over in 10 weeks; the remaining 25,000 SF including the Data Center was completed four weeks later
  • 2nd Floor Demolish existing offices, open furniture areas, two bench labs and an IOS (14,000 SF) raised floor rack lab supported by 120-ton dry cooler system and two new electric rooms each with a 225 KVA transformer

Boxborough, MA

Location

105,000

Square Footage

MULTIPLE - IA Architects/AHA

Architect

Project Features

Conference Rooms

Kitchen

Open Plan

Break Room

Reception Area

Get in touch

How can we help you?

Guaranteeing quality workmanship is possible only through the high standards that in-house and subcontractor teams deliver to our clients, on every project. That's our promise. Let's talk about how we can help you.

Contact Us